Request to Remove Hankook from spec tire supplier
#31344 from G. Brian Metcalf · No action required · Minutes (2021-12 Fastrack)
Thank you for your letter. The Spec tire contract with Hankook is in place through 2023.
BoP Lab / Rules / Letter #31344
From G. Brian Metcalf · B-Spec · No action required
#31344 from G. Brian Metcalf · No action required · Minutes (2021-12 Fastrack)
Thank you for your letter. The Spec tire contract with Hankook is in place through 2023.