Committee) SMX Data Acquisition Language
#37154 from Spec Mazda (SM/SMX · Recommended to the Board · Minutes (2024-12 Fastrack)
In GCR, Section 9.1.7.1.D.20.1 , changes as follows:
"A technical evaluation process for cars is available from the Series. Part of this process is the required download of AiM Data
files after each timed session (Qualifying 1 & 2, Races 1 & 2). Within 30 minutes of each timed session end, all Series
Competitors MUST send the AiM Data file (.XRK) for all timed laps of that session to the secure email address (data@specmx-
5.com), where data will be reviewed by AiM directly. Failure to adhere to this guideline from the Series, or having non-
functioning data, may be grounds for penalty or disqualification. by the Series."